Stock Management - Standard Cycles
The standard cycles all include an option to calculate the toolpaths according to the stock remaining material.
In this case , the red operation is programmed first. The orange operation is calculated and goes machining the pocket only where the material is left. | ![]() |
This stock management is available in Finish contour. It enables to manage overcutting areas with stock management. | ![]() |